Update July 2022

Yarabee Road Play Space is now open for play. Some minor works will be taking place mid-July so the play space will closed for a couple of days.


Update April 2022

Site establishment for the new play space at Yarrabee Road has been delayed and will now begin 27 April.

Update March 2022

Site establishment for the new play space at Yarrabee Road will begin in the week starting 11 April with completion expected to be in early May.

Update January 2022

Council would like to say a BIG THANK YOU to the 41 Participants in the Stage 1 consultation and the 21 Participants in the Stage 2 consultation to assist in the development and finalisation of the concept plan for the Yarrabee Road, Greenhill Play Space. The Stage 2 Consultation Report is now available and we can confirm that demolition of the existing play space and construction of the new one will occur in approximately April 2022.

We anticipate that the new play space will be complete by 30 June 2022 (weather dependant).

Please come back here to check on updates as we go.

Thanks again!



The Yarrabee Road play space upgrade was identified in Council’s 2021/22 Annual Business Plan process and $180,000 is allocated to build it. A portion of which will need to cover landscaping and site preparation and the remaining costs will be on the play space elements (equipment, seating, and signage).

This play space is classified as a ‘Local’ Play Space. A ‘Local’ Play Space in the Adelaide Hills Council is:

  • An area intended for local play, often equipment based
  • Visited by people who live nearby, sometimes by foot, for a short period of time.
  • Additional general characteristics of this type of play space can be found in Council's Sport and Recreation Strategy 2017 - 2021, pp 22 - 24.

Not included in the project is formal shade structure, lighting, bbqs, public toilets, parking and fencing.

Stage 2 Consultation - Concept Plan

We’re excited to show you the concept plans for the Yarrabee Road Reserve, Greenhill Play Space Upgrade which is based on feedback from 41 participants in the Stage 1 consultation. The full concept plans are available here.

You can Have Your Say on the concept plans by:

  1. Preferably using the online feedback form below.
  2. Sending an email to engage@ahc.sa.gov.au
  3. Writing a letter to Community Engagement Coordinator PO Box 44, Woodside SA 5244
  4. Collecting a hardcopy information sheet and feedback form from any Council Service Centre or Library at Stirling, Gumeracha or Woodside.

Consultation closes 4pm, Tuesday 7 December 2021.

We will consider any feedback on the concept plan prior to construction and we will use this project page to keep you up-to-date, so please check back regularly.

Please note that plans may be subject to minor changes once construction commences and progresses.

Update July 2022

Yarabee Road Play Space is now open for play. Some minor works will be taking place mid-July so the play space will closed for a couple of days.


Update April 2022

Site establishment for the new play space at Yarrabee Road has been delayed and will now begin 27 April.

Update March 2022

Site establishment for the new play space at Yarrabee Road will begin in the week starting 11 April with completion expected to be in early May.

Update January 2022

Council would like to say a BIG THANK YOU to the 41 Participants in the Stage 1 consultation and the 21 Participants in the Stage 2 consultation to assist in the development and finalisation of the concept plan for the Yarrabee Road, Greenhill Play Space. The Stage 2 Consultation Report is now available and we can confirm that demolition of the existing play space and construction of the new one will occur in approximately April 2022.

We anticipate that the new play space will be complete by 30 June 2022 (weather dependant).

Please come back here to check on updates as we go.

Thanks again!



The Yarrabee Road play space upgrade was identified in Council’s 2021/22 Annual Business Plan process and $180,000 is allocated to build it. A portion of which will need to cover landscaping and site preparation and the remaining costs will be on the play space elements (equipment, seating, and signage).

This play space is classified as a ‘Local’ Play Space. A ‘Local’ Play Space in the Adelaide Hills Council is:

  • An area intended for local play, often equipment based
  • Visited by people who live nearby, sometimes by foot, for a short period of time.
  • Additional general characteristics of this type of play space can be found in Council's Sport and Recreation Strategy 2017 - 2021, pp 22 - 24.

Not included in the project is formal shade structure, lighting, bbqs, public toilets, parking and fencing.

Stage 2 Consultation - Concept Plan

We’re excited to show you the concept plans for the Yarrabee Road Reserve, Greenhill Play Space Upgrade which is based on feedback from 41 participants in the Stage 1 consultation. The full concept plans are available here.

You can Have Your Say on the concept plans by:

  1. Preferably using the online feedback form below.
  2. Sending an email to engage@ahc.sa.gov.au
  3. Writing a letter to Community Engagement Coordinator PO Box 44, Woodside SA 5244
  4. Collecting a hardcopy information sheet and feedback form from any Council Service Centre or Library at Stirling, Gumeracha or Woodside.

Consultation closes 4pm, Tuesday 7 December 2021.

We will consider any feedback on the concept plan prior to construction and we will use this project page to keep you up-to-date, so please check back regularly.

Please note that plans may be subject to minor changes once construction commences and progresses.

Consultation has concluded
  • Previous Consultation Stages

    Share Previous Consultation Stages on Facebook Share Previous Consultation Stages on Twitter Share Previous Consultation Stages on Linkedin Email Previous Consultation Stages link

    Stage 1 Consultation was held from 14 April to 5 May 2021

    The following information was provided at the time:

    Council is providing multiple opportunities to discuss what is possible and what can be considered to support an upgrade to the Yarrabee Road Play Space. Also, a collection of ideas, concerns and aspirations can be shared and will be reviewed. Anyone including adults, children, grandparents and anyone who uses the playground or who would like to use the playground in the future, is welcome to have a say and share their ideas.

    Join us at our 'Talking Point'

    Grab the kids and join us at the Yarrabee Road Play Space for a FREE BBQ and tell us your ideas to upgrade it on:

    • Sunday 2 May 2021
    • 11:00am - 1:00pm

    We always plan to go ahead rain, hail or shine but we will post a note here and at the playground if the plans need to change.

    Have Your Say

    • Provide your feedback quickly and easily via the feedback form below. You can also upload photos and drawings in the feedback form.
    • Attend Council's talking point on Sunday 2 May, 11am - 1pm at the Yarrabee Road Play Space
    • Email engagement@ahc.sa.gov.au
    • Phone: 8408 0400
    • Post: PO Box 44 Woodside SA 5244

    Consultation closes: 5pm, Wednesday 5 May 2021.

    UPDATE June 2021

    41 participants provided feedback in the Stage 1 Consultation. Feedback has been collated and will be used to inform the concept design for the play space.

    The community engagement outcomes report from Stage 1 is available in the document library on the right and provides an analysis of all feedback received.

    When the concept design has been developed we will inform all participants when it is available in our Stage 2 Consultation. Participants will be able to let us know if there are any further comments or concerns prior to the upgrade of the playground next year.

    A BIG thank you to everyone who provided their feedback.